15KWH 300Ah Lithium Ion Battery Pack Lifepo4 51.2V High Quality Mobile Vertical Solar Battery
MOQ:2 sets
Features
LS-15-51-20 15kwh Battery(pulley)
• liFe PO4 battery 15kwh,51.2V 300AH
• Capacity: 100ah*3
• Voltage: 51.2V (42-58.4V)
• BMS: 16S300A
• Battery voltage: 48V
• Communication: CAN/RS485
• Capacity: 100ah*3
• Voltage: 51.2V (42-58.4V)
• BMS: 16S300A
• Battery voltage: 48V
• Communication: CAN/RS485
- Overview
- Parameter
- Related Products








300AH-51.2V pulley Lithium battery
Precautions for installation:
1. Before installation, please make sure that the battery grounding wire, cabinet grounding wire and the safety grounding terminal of the power distribution unit are well connected, and the safety grounding terminal is well connected with the external grounding bar.
2. Connect the positive wire tie between the battery and the protective air switch and the negative wire tie between the battery in order.
3. Connect the communication cables between batteries in order.
4. When connecting the main output air switch of the cabinet externally, pay attention not to reverse the positive and negative polarity.
5. When the RS485 communication line is connected externally, pay attention not to reverse the A/B line.
5. When the RS485 communication line is connected externally, pay attention not to reverse the A/B line.
6. The battery shall be installed on the cabinet column with screws through the lug, and the bottom shall be supported by the bearing bracket.
7. Please select a location that is conducive to heat dissipation to avoid contact with water.
8. The installation plane of the battery cabinet must be kept horizontal.
Usage method:
1. First, check that the cabinet general output air switch and the battery singlegroup protection air switch are disconnected.
2. Set the addresses of three groups of batteries as 1, 2 and 3 respectively.
3.Turn on the switches on the battery panel in sequence, wait for the battery self-test to finish, and enter the initial battery
interface.
interface.
4. After the battery is successfully started, turn on the single battery protection air switch and the cabinet total
output air switch on the power distribution unit in sequence.
output air switch on the power distribution unit in sequence.
Fault prompt:
The indicator light is not on: the battery pack cable is poorly connected; Battery switch OFF status; BMS is in sleep mode; Damaged BMS Alarm red light flashing: generated by recoverable alarm The red alarm light is always on: the battery is damaged